Sheraton Batumi The flooring of the mechanical shaft were equipped with insulation to prevent the spread of fire transitions. Date: 1 January 2008 Category: Construction Next Related projects Construction Vadi Istanbul Construction Kanyon Shopping Mall Construction Rings İstanbul Shopping Mall and Residence Construction Göztepe Nida Tower